How long does the SnapMirror update take to finish?

Click the Exhibit button.

A client has a SnapMirror relationship between two sites that is scheduled to run once a day at 12:15 a.m. They have a network connection between two sites that provides 100 Mbps on bandwidth. By performing the backup at this time, they can maximize their bandwidth use.
Referring to the exhibit, how long does the SnapMirror update take to finish?
A. one hour
B. four hours
C. three hours
D. two hours

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.