Identify two correct Restart values for parallel steps in load plans. (Choose two.)
A. Restart from new session.
B. Restart from failure.
C. Restart from failed children.
D. Restart all children.
Identify two correct Restart values for parallel steps in load plans. (Choose two.)
A. Restart from new session.
B. Restart from failure.
C. Restart from failed children.
D. Restart all children.
I apologize, for parallel steps the values are: “Restart all children” and “Restart from failed children” (so, the answer is correct: CD). The values “Restart from failure” and “Restart all children” are for serial steps.
https://docs.oracle.com/middleware/1213/odi/develop/loadplans.htm#CHDEIFJJ
The correct answer is “Restart from failure” and “Restart all children”; so, the correct answer is BD