What is one step that the network administrator must complete before connecting to the controller on its new IP address?

A network administrator maps a network profile with a VLAN ID 512 to the LAN port of an HP MSM765 zl Mobility Controller. The network administrator configures an IP interface for this profile and intends to contact and manage the controller on this interface. All other settings remain at default.
What is one step that the network administrator must complete before connecting to the controller on its new IP address?
A. Set the IP interface as the authorized egress VLAN in the default VSC.
B. Set the untagged LAN port network interface IP address to none.
C. Select the new IP interface as an active interface in the Controller >> Management > Management tool window.
D. Enable Spanning Tree Protocol (STP) on the interface.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.