Which component is causing the problem?

Your customer’s MetroCluster has generated a “DISK REDUNDANCY FAILED” message.
Netapp-EmA:
Tue Jan 14 04:12:12 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’ failed. Tue Jan 14 04:12:13 CET [netapp-EmA:rv.connection.torndown:info]: HA interconnect: cfo_rv1 is torn down on NIC 1. Tue Jan 14 04:12:13 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’1 failed. Tue Jan 14 04:12:15 CET [netapp-EmA:rv.connection.torndown:info]: HA interconnect: cfo_rv2 is torn down on NIC 1. Tue Jan 14 04:12:18 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’2 failed.
Tue Jan 14 04:12:19 CET [netapp-EmA:bridge.removed:info]: FC-to_SAS bridge siteB_2:13.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111161] was removed Tue Jan 14 04:12:19 CET [netapp-EmA:bridge.removed:info]: FC-to_SAS bridge siteB_2:5.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111160] was removed Netapp-EmB:
Tue Jan 14 04:12:12 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’ failed. Tue Jan 14 04:12:12 CET [netapp-EmB:rv.connection.torndown:info]: HA interconnect: cfo_rv2 is torn down on NIC 1.
Tue Jan 14 04:12:13 CET [netapp-EmB:rv.connection.torndown:info]: HA interconnect: cfo_rv1 is torn down on NIC 1. Tue Jan 14 04:12:13 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’1 failed.
Tue Jan 14 04:12:18 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for ‘cfo_rv’2 failed.
Tue Jan 14 04:12:19 CET [netapp-EmB:bridge.removed:info]: FC-to_SAS bridge siteA_2:13.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111167] was removed Tue Jan 14 04:12:19 CET [netapp-EmB:bridge.removed:info]: FC-to_SAS bridge siteA_2:5.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111164] was removed Referring to the messages shown in the exhibit for each node, which component is causing the problem?
A. the ATTO bridge on siteB_2
B. the SAN switch siteA_2
C. the SAN switch siteB_2
D. the ISL between siteA and site B

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.