Click the Exhibit.
A customer on MSTI-2 was isolated due to a physical link outage on Switch 5’s ge-0/0/32 interface.
Referring to the exhibit, which corrective action would solve this problem?
A. replace the link between Switch 5 and 6 with a 10 Gbps link
B. Implement the CIST on all switches.
C. Move the root bridge for MSTI-2 to Switch 6.
D. Add MSTI-2 to all interfaces on Switch 5.