Which event requires an unplanned switch of the production workload?

In an SRDF/Star environment, which event requires an unplanned switch of the production workload?
A. Network failure between the workload and either target site
B. Failure of the asynchronous target site
C. Failure of the synchronous target site
D. Failure of the workload site

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.