Which four actions should you perform in sequence?

DRAG DROP
A software company has a Windows Server 2012 R2 server that has the Hyper-V role installed. The server hosts a single virtual machine (VM) named VM1. VM1 has one virtual CPU, one virtual hard disk, and one virtual network interface card (NIC) that is attached to an external network.
The company prepares to test its software in VM1. Before testing begins, VM1 must meet the following requirements:
. Availability of network bandwidth must be maximized.
. VM network connectivity must be fault tolerant.
You need to configure the environment.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:


microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.