Field Activities of specific types can be created by the system automatically based on the type of work to be carried out, connection status of a service point, and the meter’s installation and connection status.
Which four processes are based on the above? (Choose four.)
A. starting service
B. disconnecting service
C. testing a meter or item in the field
D. stopping service
E. disconnect Warning