Which option would allow for the addition of the new hosts while maintaining the redundant infrastructure at least cost?

A customer has deployed redundant switched fabrics in a HA environment which also includes non-HA, single-attached test servers. A new project requires additional connectivity for new HA servers to be placed into production, but there are not enough free ports available in one of the existing fabrics to complete the HA deployment. Which option would allow for the addition of the new hosts while maintaining the redundant infrastructure at least cost?
A. Add a new switch to the problem fabric to increase available ports on the switches.
B. Add a new switch to both fabrics to increase available ports on the switches.
C. Add ISL’s between the existing fabrics to leverage all available ports on the switches.
D. Cascade the existing switches into a new director class switch and add the hosts to the director.

comptia-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.