Which statement is true regarding scheduling a reclamation process without impacting client backup in IBM Spectrum Protect?
A. Reclamation should be allowed to happen only by the automatic threshold.
B. Reclamation should be scheduled to start after client backups finish utilizing a duration that ends before client backups start.
C. Reclamation is only scheduled through an administrative script.
D. Reclamation can only be scheduled through the Operations Center.
Correct Answer: A
Explanation/Reference:
Volume reclamation occurs when the reclamation threshold for the container-copy storage pool is less than 100%. However, onsite volumes are not a candidate for reclamation until they are 75% full.
References: http://www-01.ibm.com/support/docview.wss?uid=swg27048653