Which step should the engineer perform to accomplish these requirements?

Scenario: A Citrix Engineer is managing a Provisioning Services Farm with the following specifications:
– A single Farm with one Site, with two Provisioning Services servers deployed with 8 vCPU each, which are supporting a total of 500 target devices in production.
-The ports and threads have been configured so that each server can stream concurrently to 250 devices each.
-Due to an upcoming merger, 250 more target devices must be supported by the existing Provisioning Services farm.
-The Provisioning Services servers must handle the extra capacity while aligning to Citrix leading practices for resiliency.
Which step should the engineer perform to accomplish these requirements?
A. Isolate the Provisioning Services streaming traffic.
B. Add two additional Provisioning Services servers to the Site.
C. Maintain the existing configurations for the environment.
D. Add one additional Provisioning Services server to the Site.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.