When building your implementation plan, providing dual power for all systems is critical.
Which three actions should be mandated? (Choose three.)
A. Dual power supplies should be placed in all equipment.
B. Dual power feeds should be run to all equipment.
C. Power feeds should be connected to the closest available outlet inside the cabinet.
D. Power feeds should be connected to separate circuits on the same data center PDU.
E. Power feeds should be connected to separate outlets connected to two separate PDUs.