Which three are valid infrastructure costs that can be configured by editing Cost Drivers in vRealize Business Standard?

Which three are valid infrastructure costs that can be configured by editing Cost Drivers in vRealize Business Standard? (Choose three.)
A. Operating System Licensing
B. Storage (per GB)
C. Network (per switch)
D. Hardware Maintenance (per month)
E. Memory (per GB)

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.