Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?

You are the Test Manager of a project that adopts a V-model with four formal levels of testinG. unit, integration, system and acceptance testing.

On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.

Assume that no requirements defects have been reported after the release of the product.

Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?

A. Number of defects found during the requirements review

B. Total number of defects attributable to requirements found during unit, integration, system and acceptance testing

C. Total number of defects found during functional specification review, high-level design review, low- level design review, code review, unit testing, integration testing, system testing and acceptance testing

D. Time to conduct the requirements review

E. Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.