Which two pre-requisites must be met to complete the installation using vRealize Suite Lifecycle Manager?

An administrator is looking to install SaltStack Config to integrate with existing vRealize Automation environment.
Which two pre-requisites must be met to complete the installation using vRealize Suite Lifecycle Manager? (Choose two.)
A. Access to NSX-T Load Balancer
B. Integrate vRealize Automation with Active Directory
C. Access to a vRealize Automation tenant
D. A valid vRealize Automation license key
E. Access to NSX-T Data Center cloud account

microsoft-exams

0 thoughts on “Which two pre-requisites must be met to complete the installation using vRealize Suite Lifecycle Manager?

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.