Which two sections of the report should you review? Each correct answer presents a complete solution.

You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure.
You are reviewing the SAP EarlyWatch Alert report for the system.
You need to recommend sizes for the Azure virtual machines that will host the system.
Which two sections of the report should you review? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. Hardware Capacity
B. Patch Levels under SAP Software Configuration
C. Hardware Configuration under Landscape
D. Database and ABAP Load Optimization
E. Data Volume Management

AZ-120: Planning and Administering Microsoft Azure for SAP Workloads

Free dumps for AZ-120 in PDF format also you can read online.

High quality AZ-120 PDF and software. VALID exam to help you pass.

microsoft-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.