Which two statements describe how to enable the final configuration?

You need to implement FC routing in your Gen 5 fabric. The backbone fabric will contain a factory default Brocade 7800 Extension Switch and a Brocade DCX 8510-8 with two FC16-32 blades. VEX_Port connectivity to the edge fabrics will be needed in the final configuration.
Which two statements describe how to enable the final configuration? (Choose two.)
A. An Integrated Routing license must be installed on the Brocade 7800 Extension Switch.
B. LSAN zones must be configured in the backbone.
C. VEX_Ports must be configured on the Brocade DCX 8510-8.
D. VEX_Ports must be configured on the Brocade 7800 Extension Switch.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.