You have configured three logical tunnel interfaces in a tenant system on an SRX1500 device. When committing the configuration, the commit fails.

You have configured three logical tunnel interfaces in a tenant system on an SRX1500 device. When committing the configuration, the commit fails.
In this scenario, what would cause this problem?
A. There is no GRE tunnel between the tenant system and master system allowing SSH traffic
B. There is no VPLS switch on the tenant system containing a peer It-0/0/0 interface
C. The SRX1500 device does not support more than two logical interfaces per tenant system
D. The SRX1500 device requires a tunnel PIC to allow for logical tunnel interfaces