After you replace a network adapter card in a NetApp node, what should be done before you put the node back into production?
A. From the cluster::> prompt, use the sldiag utility for testing before rejoining the cluster.
B. From the LOADER> prompt, use the boot_diags command and use the sldiag utility for testing.
C. From the LOADER> prompt, use the boot_ontap command to boot into ONTAP and use the sldiag utility for testing.
D. From the cluster::> prompt, use the set diag command for testing before rejoining the cluster.