What should the administrator verify on the BladeCenter Chassis?

An administrator is attempting to configure a new deployment of 56 POWER7 Blades across 4 IBM BladeCenter H chassis. Each blade will be installed with an IVM and 2 LPARs.IVM is installed and the administrator checks that both LHEA ports are reporting a Link State of "Up." 2 LPARs are created and the network traffic balanced by allocating one LHEA port to the first LPAR, the second port to the other. After successfully installing the first LPAR via NIM, the administrator finds the second LPAR fails to netboot. What should the administrator verify on the BladeCenter Chassis?
A. That 4 power supplies (PSU) have been installed.
B. That both the external LHEA ports have been cabled.
C. That a secondary I/O module has been installed and cabled.
D. That the Multi-Core Scaling (MCS) attribute is correctly set on both LHEA ports.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.