When will the backup run next?

Refer to the exhibit.


A full backup schedule has been set up as frequency-based and has been set to run once per week. The schedule’s start window has been set up as shown in the exhibit.
The following events occurred last week:
The scheduled backup ran automatically on Monday and was successful. A manual backup was run on Tuesday and was successful.
A manual backup was run on Thursday and failed.
This week, when will the backup run next?
A. Monday
B. Tuesday
C. Wednesday
D. Saturday

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.