The client has outlined in the discovery phase of the project that they want to incorporate two geographical locations, A and B respectively. Each location will be processing their own document types but will only need to export the images to an IBM FileNet P8 server that exists in location A. The clients wide area network is slow. Where should the batch and project files be stored?
A. Taskmaster server at location A.
B. Taskmaster Web server at location A.
C. Local network share at locations A and B.
D. Taskmaster Rulerunner server share at locations A and B.