A customer has a BladeCenter S (BCS) with an 8-core POWER6 blade, 1.5TB of storage and an external LTO tape drive installed. They want to upgrade to a P0WER8.
Which of the following is the lowest cost recommendation to satisfy their requirement?
A. Flex System and POWER8 node
B. S824
C. POWER8 blade in the current BCS
D. S814