Which of the following provides the BEST risk calculation methodology?

Which of the following provides the BEST risk calculation methodology?
A. Annual Loss Expectancy (ALE) x Value of Asset
B. Potential Loss x Event Probability x Control Failure Probability
C. Impact x Threat x Vulnerability
D. Risk Likelihood x Annual Loss Expectancy (ALE)