Which phase should a Technical and Delivery Assessment (TDA) be conducted for determining power cord configuration?

During which phase should a Technical and Delivery Assessment (TDA) be conducted for determining power cord configuration?
A. Post-sale
B. Pre-sale
C. Post-install
D. Pre-install

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.