Which setting will ensure that the job runs as soon as the system comes back up?

A scheduled cleanup job runs every day at 6 a.m., but the system is down at 6 a.m.
Which setting will ensure that the job runs as soon as the system comes back up?
A. Change the job schedule entry to specify *IPL for the Frequency
B. Change the job schedule entry to specify *IPL for the Entry number
C. Change the job schedule entry to specify *CURRENT for the Next Submit Date
D. Change the job schedule entry to specify *SBMRLS for the Recovery Action

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.