An administrator is working on a hardware replacement for a current system.
Which tool should be used to determine if the current LIC, OS, and existing adapters may be migrated to the new system?
A. IBM PreUpgrade Verification Tool
B. IBM Workload Estimator
C. IBM System Planning Tool
D. IBM Migration Modeler
sorry, correct is A
Cootect is A