Which two steps are required to accurately document the existing port configuration?

A deployment engineer needs to upgrade an existing dual-controller SC030 system to a dual-controller SC800 system. The deployment engineer needs to document the existing port configuration to prepare to start the physical upgrade.
Which two steps are required to accurately document the existing port configuration? (Choose two.)
A. Record the Hardware Serial Number (HSN), System Serial Number (SSN), and SCOS version from each controller
B. Create cable labels to correlate the Starting Inventory Slot and Port to the Ending Inventory Slot and Port.
C. Record the firmware version of the current controller 10 Cards/Ports and final controller 10 Cards/Ports.
D. Create a current controller 10 Card/Port Usage table and a final controller 10 Card/Port usage table.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.