Due to an unexpected power outage, Site A is completely down. The disaster recovery strategy was implemented (see diagram) What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online? +
A. Perform “Failover”
B. Perform Instant VM recovery of affected VMs
C. Power on VMs manually on vCenter B.
D. Execute “Planned failover”
Correct is A??
C is the correct one as the site-a is down how to make the faillover nothing do to do from site B power on the VM from the vcenter o host.
The replications is already in place. So it is a matter of failing over to the replicas.