Due to an unexpected power outage, Site A is completely down. The disaster recovery strategy was implemented (see diagram) What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online?

Due to an unexpected power outage, Site A is completely down. The disaster recovery strategy was implemented (see diagram) What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online? +

A. Perform “Failover”
B. Perform Instant VM recovery of affected VMs
C. Power on VMs manually on vCenter B.
D. Execute “Planned failover”

Download Printable PDF. VALID exam to help you PASS.

3 thoughts on “Due to an unexpected power outage, Site A is completely down. The disaster recovery strategy was implemented (see diagram) What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online?

  1. C is the correct one as the site-a is down how to make the faillover nothing do to do from site B power on the VM from the vcenter o host.

    3
    19

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.