Click on the calculator icon in the upper left-hand corner. A customer has a 2 TiB LUN which will be mirrored with MirrorView/S. Analyzer shows the current workload to be 500 8 KiB IOPs with a R/W ratio of 3:1. The customer requires that the mirror should resynchronize within 2 hours if fractured for
10 minutes or less. How much bandwidth is required to meet customer requirements?
A. 10 Mb/s
B. 20 Mb/s
C. 54 Mb/s
D. 114 Mb/s