What would you change in this design?

Refer to the exhibit.


While trying to maximize availability for CIFS clients, the customer has designed the following 10 Gb/s IP environment. What would you change in this design? a. Ensure every connection has a failover to another switch. b. Two Nexus switches are needed and the connection to the third switch removed. c. Add three more connections to the VNX. d. Change from LACP to EtherChannel for higher performance. e. Upgrade to a VNX7500 to provide additional Data Movers.
A. a) and b)
B. a) and b) and c)
C. b) and d)
D. c) and d) and e)

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.