What are two viable scenarios to test LUN multipathing on Host 1?

Exhibit.

Referring to the exhibit. What are two viable scenarios to test LUN multipathing on Host 1?
(Choose two.)
A. Reboot one of the switches.
B. Disable one of the FC LIFs on Controller 1.
C. Disconnect one of the host cables.
D. Reboot Host 1.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.