What do you need to troubleshoot to move all active/optimized FC paths to the AFF A300 HA pair?

Exhibit.

The host in the exhibit is connected to a 4-node ONTAP SAN using dual-fabric implementation. LUNs have been mapped LUN through all available UFs on nil (our nodes. Switch 2 is powered off for highavailability testing.
How many paths per LUN would you expect the host to see in this scenario?
A. 2
B. 6
C. 4
D. 8

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.