When an NP port becomes operational, the NP switch first logs itself into the core switch by sending a FLOGI request (using the port WWN of the NPport). What will occur next?
A. The switch registers with the fabric name server.
B. The switch will perform a PLOGI to the port login server.
C. The switch will register parameters using FDISC.
D. The NPV switch will perform a PLOGI using FDISC to register with the fabric name server.