You want to leave one of your leaf switches connecting to your ACI fabric to another rack. It will be reconnected to the same fabric after the move. Which operations must you perform before the move?
A. Disable the interfaces.
B. Blacklist the ports.
C. Decommission the switch and remove from the controller.
D. Decommission the switch.