Without adding new cluster interconnect switches, you want to nondisruptively upgrade from FAS2554 controllers to FAS8200 controllers on an existing 2-node switchless cluster running ONTAP 9.1 software.
Which statement is correct in this scenario?
A. Relocate the aggregates to one FAS2554 node, takeover, replace the node in takeover state with a FAS8200 node, reassign the disks, giveback, and repeat for the second node.
B. Connect the FAS8200 to the FAS2554 with interconnect cables, join the existing cluster, relocate the aggregates from the FAS2554 to the FAS8200, and decommission the FAS2554.
C. Set up the FAS8200 as a new cluster, move the SVMs from the FAS2554 to the FAS8200 using SVM move, and decommission the FAS2554.
D. You cannot perform this task nondisruptively.