Which three steps are needed to accomplish this task?

A customer buys a new switchless ONTAP 9.1 FAS2650 cluster. You are asked to install the system at the customer’s site. Which three steps are needed to accomplish this task? (Choose three.)
A. Cable the ACP.
B. Cable the cluster-interconnect to the CN1610 switches.
C. Connect both power cords.
D. Install the system in the rack.
E. Cable the controller for switchless ONTAP software.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.