Which two statements are true in this scenario?

You are adding two new nodes into an existing switchless 2-node cluster.
Which two statements are true in this scenario? (Choose two.)
A. You first need to install the cluster interconnect switches to the existing cluster.
B. You must make sure that the existing nodes are healthy and that all cluster links are up.
C. The existing cluster must use clustered Data ONTAP 8.1 or later software.
D. You need to schedule downtime to add these two nodes.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.