Which two actions should be performed to the cluster before installing the new shelves?

Click the Exhibit button.

You are adding new DS224C shelves in a new stack to your cluster with FAS8060 controllers running ONTAP 9.7.
Referring to the exhibit, which two actions should be performed to the cluster before installing the new shelves? (Choose two.)
A. Move the SAS cables to a new stack.
B. Enable in-band ACP.
C. Remove the Ethernet cables.
D. Disable out-of-band ACP.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.