Which two conditions must be fulfilled before you start the migration?

You are asked to add a new HA pair to an existing 2-node switchless AFF A220 cluster. You must first convert to a 2-node switched cluster using Broadcom BES-53248 cluster switches. Which two conditions must be fulfilled before you start the migration? (Choose two.)
A. All cluster LIFs must be in the up state and on their home ports.
B. The “Enabled Switchless Cluster” option must be manually set to “false”.
C. All cluster LIFs must have an MTU size of 1500.
D. The 2-node switchless configuration must be properly set up and functioning.