How can this be accomplished?

A company wants to trigger a PM based on a characteristic type meter.
How can this be accomplished?
A. Create a master PM and link to the characteristic on the Related Records tab.
B. Create a condition monitoring point and specify the PM on the upper or lower limit.
C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
D. Create an escalation based on the characteristic meter and trigger the PM via an action.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.