Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met?
Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining…