Testing should be stopped when:

Testing should be stopped when:
A. All the planned tests have been run
B. Time has run out C. All faults have been fixed correctly
D. Both A and C
E. It depends on the risks for the system being tested

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.