What should you do to minimize the interruption?

The full boot cycle of the CN1610 should take approximately 50 seconds.
What should you do to minimize the interruption?
A. Remove all of the cables from the CN1610 CL1 switch, and then connect them to different ports on the CN1610 CL2 switch.
B. You can migrate the cluster LIFs from the switch that is to be rebooted, and then revert the cluster LIFs after the switch has finished rebooting
C. You can migrate Data LIFs to different ports on different nodes.
D. On each respective switch, use the network interface migrate command to migrate the inter-switch links.

Download Printable PDF. VALID exam to help you PASS.

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.