Which steps must be taken when migrating from a cascaded topology to a core-edge topology?

Which steps must be taken when migrating from a cascaded topology to a core-edge topology? (Select two)
A. Calculate the number of ports needed for the additional ISLs
B. Remove the cross-connected ISLs and leave the outer-connected ISLs
C. Connect required servers, storage devices, and core switches
D. Re-cable the ISLs to connect all edge switches to the core switches
E. Connect high-performance servers to both a core switch and an edge switch