What do you have to consider regarding consumption? (Choose two)
A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption is restructured with the planning run.
C. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.