Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
A. MPS items are planned in a standard MRP run.
B. The planning of MPS and non-MPS items is always carried out in one planning run.
C. Non-MPS items can be taken into consideration by an MPS run.
D. MPS items can be defined on plant level.
E. MPS items can be defined on MRP area level.