Which of the following are characteristics of ECC master production scheduling (MPS)?

Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
A. MPS items are planned in a standard MRP run.
B. The planning of MPS and non-MPS items is always carried out in one planning run.
C. Non-MPS items can be taken into consideration by an MPS run.
D. MPS items can be defined on plant level.
E. MPS items can be defined on MRP area level.