Which option for selecting a routing exists when you create a production order?
A. Automatic selection of a reference operation set
B. Manual selection based on settings in the order type-dependent parameters
C. Automatic selection based on the selection ID in the material master
D. Manual selection based on the list of routings maintained in the material master