The data below were gathered on two different machine centers and two products.
Which item below would be part of a linear programming formulation of this problem?
A. Maximize: Contribution 4A + 5B.
B. Subject to: A 0.
C. Subject to: 2.5A+4B60.
D. Subject to: 4A + 5B130.
Correct Answer: C
Explanation/Reference:
Explanation:
The linear programming solution is subject to constraints on the availability of machine hours in both centers. For example, products A and B require 2.5 and 4 hours per unit, respectively, in Machine Center 1, but only 60 hours are available. Hence, the optimal production of A and B to the following constraint:
2.5A + 4B 60