Which of the configuration is correct?

You have been asked to install and configure a new switch in a customer network. Use the console access to the existing and new switches to configure and verify correct device configuration.

300-115-implementing-cisco-ip-switched-networks-switch-v2-0_img_067

You are connecting the New_Switch to the LAN topology; the switch has been partially configured and you need to complete the rest of configuration to enable PC1 communication with PC2.
Which of the configuration is correct?

300-115-implementing-cisco-ip-switched-networks-switch-v2-0_img_068

A. Option A
B. Option B
C. Option C
D. Option D
E. Option E

cisco-exams

Leave a Reply

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.